Originally separate bathroom and ensuite, the divider wall was removed and a single large bathroom was developed.
A drain leak in a second floor shower initiated this complete ensuite renovation utilizing the Schluter shower system.
A basic tub replacement project.
A major basement bathroom project which involved significant in-floor drainage re-work.
A major main bathroom renovation which involved relocation of the tub, vanity and toilet.
This ensuite was added where previously there was no ensuite.
A major main bathroom renovation which involved widening the room from five feet to fit a six foot tub.